On a giga project a good picture is not enough. The owner wants dated, documented progress, the consultant checks the quantities, and the contractor needs a number it can defend in the payment application. So every visit repeats the same flight path, height and ground control, and month-to-month comparison becomes a measurement rather than an impression.
We work as a subcontractor under the main contractor’s HSE and quality systems, and deliver in the project coordinate system and the formats your team already uses.
1,399 logged flights across Saudi Arabia since November 2023, from our AirData flight log
What we deliver on your project
- Monthly progress captureRepeat visits on the same path and height, with orthomosaics, oblique imagery and month-on-month comparison for the owner’s report.
- Earthworks and stockpile volumesVolumes from an accurate surface model against the design surface or the previous survey, to support payment applications.
- Topographic and as-built surveyOrthomosaics, elevation models and contours on RTK with ground control, with an accuracy report for every delivery.
- 3D models and point cloudsSite and structure models for coordination, documentation and design review.
- Flood and drainage studiesA terrain model from the survey and a runoff simulation, to plan drainage and protect the site during construction.
- Thermal inspectionRadiometric inspection of roofs, electrical systems and curing concrete, with a visible image for every finding.
- Progress films for managementCinematic footage up to 6K for management presentations and quarterly reporting.
Safety, permits and data
We obtain the flight authorisation from the General Authority of Civil Aviation (GACA). Many giga-project sites add their own rules on top: site flight approval, safety induction, permits to work and sometimes a security escort. We confirm these with the site HSE and security teams before we mobilise, and submit a method statement and risk assessment for approval.
The data belongs to the client. We do not publish any image or data from your site without written consent, and we sign an NDA on request.
How it runs
- You send the location, the programme, the deliverables and the coordinate system.
- We check the airspace and site rules and prepare the method statement and risk assessment.
- The first visit fixes the ground control and the reference flight path; later visits repeat them exactly.
- Deliverables arrive on the date set in the proposal, with an accuracy report against independent checkpoints. For remote sites, mobilisation is a separate line in the proposal.
Where we work
We mobilise from Riyadh. Qiddiya, Diriyah and the large communities around the capital are within a working day; for sites in the Tabuk region, NEOM and the Red Sea coast we plan multi-day mobilisations that combine visits.
Examples of our work
Case studyQiddiya: from one drone survey to a 2D flood modelRead the case study
Case studyAl Ghat: 120 ha in one day on RTK, with the accuracy statedRead the case study Frequently asked questions
Do you work directly for NEOM, Red Sea Global or the other developers?
We work through the contractors and consultants on site. Our giga-project work to date includes a drone survey and a 2D flood model at Qiddiya; the case study is published on our site.
Can you work under our site HSE system?
Yes. We attend the safety induction, submit a method statement and risk assessment, and follow the site permits to work and rules before any flight.
What accuracy do you deliver?
With ground control, horizontal accuracy is ±1–3 cm, and every report states the accuracy actually achieved on independent checkpoints rather than a generic figure.
What formats and coordinate system do you deliver in?
The project coordinate system, such as KSA-GRF17 or the project grid, in formats such as DWG, DXF, GeoTIFF, LAS and SHP, with a PDF report.
Who owns the data?
The client. We do not publish any image or data from the site without written consent.